Teka TGF 390 NF Manuel D'utilisation page 30

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
8. Install the upper hinges into the relative axle holes on the right (upon the door) at first, then
place the door on the lower hinges, press upper hinges into hinge fixed legs and fix the
upper hinges at last.
9. Install top-beam decoration, nut caps and hinge cover plates.
31

Publicité

Table des Matières
loading

Table des Matières