Hydraulic Connection; Dhw Connection And Safety Assembly - Stiebel Eltron HSBC 300 cool Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATIoN
Installation

10.2.4 Hydraulic connection

Note
f Observe the details specified in the chapter "Installa-
f
tion / Specification / Hydraulic diagrams".
f Thoroughly flush the pipes before connecting the heat pump.
f
Foreign bodies (e.g. welding pearls, rust, sand, sealant, etc.)
can impair the operational reliability of the heat pump.
f Install the heating water pipes (see chapter "Specification /
f
Dimensions and connections").

10.3 DHW connection and safety assembly

10.3.1 Safety instructions
Material losses
!
The maximum permissible pressure must not be exceed-
ed (see chapter "Specification / Data table").
Material losses
!
Operate the appliance only with pressure-tested taps.
Cold water line
Galvanised steel, stainless steel, copper and plastic are approved
materials.
Material losses
!
A safety valve is required.
DHW line, DHW circulation line
Stainless steel, copper and plastic are approved materials.
46
| HSBC 300 cool | HSBC 300 L cool
10.3.2 Installing the pipe assembly (accessory) if required
Note
The following diagrams show pipe assembly RBS-SBC
(see chapter "Specification / Dimensions and connec-
tions").
1 Pipe outlet
f Fit the pipe outlets in the retainer.
f
f Hook the retainer for the connection pipes into the top centre
f
of the appliance.
f Secure the retainer with the screws.
f
1
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hsbc 300 l cool

Table des Matières