Fold Down Guardrails; Fold Down Procedure (Figure 5); Erection Procedure - Upright SL26SL Guide De L'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fold Down Guardrails

F
D
OLD
OWN
This procedure is only for passing through doorways. Guardrails must be returned to proper position
before using the machine.
F
D
O L D
NOTE: When performing the following procedures retain all fasteners.
1. Place controller on platform.
2. Starting at the front of the platform, remove nuts, bolts and washers from the top of the front guardrail.
Fold the front guardrail down onto the platform.
3. Close and latch the gate.
4. Remove nuts, bolts and washers from the top of the rear guardrail. Fold the rear guardrail down onto the
platform being careful to keep gate latched at all times.
5. Remove nuts, bolts and washers from the top of the side guardrails and from the slideout deck midrail.
Lift up and fold one side guardrail in so it rests on the deck. Repeat with other side guardrails.
E
R E C T I O N
1. Raise side guardrails making sure each is pushed down to secure the guardrail in the vertical position.
2. Install bolts, washers and nuts between the side guardrails, tighten securely.
3. Raise rear guardrail assembly, aligning holes and install bolts, washers and nuts. Tighten securely.
4. Raise front guardrail, aligning holes and install bolts, washers and nuts. Tighten securely.
5. Hang controller from front guardrail.
6. Before operating work platform check that all fasteners are in place and properly torqued (See Specifica-
tions).
W A R N I N G
!
Before entering the work platform, guardrails must be securely fastened in their proper position.
Operator Manual
All manuals and user guides at all-guides.com
G
UARDRAILS
P
O W N
R O C E D U R E
P
R O C E D U R E
(F
5)
I G U R E
!
060588-026 SL26/30SL
Figure 5: Fold down guardrails
Page 11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sl30sl13772

Table des Matières