Transport to installation site
2
1
3
The appliance is very heavy.
Take maximum care during handling to
avoid injury.
The appliance should always be transport-
ed in an erect position.
Avoid at all costs leaning it on its front side.
All manuals and user guides at all-guides.com
Since this is a large and heavy appliance, before transporting the ap-
and unpacking
pliance, check the access to the location where it will be installed
(door size, manoeuvring space in stairwells, etc.).
The appliance is attached to the base of the packaging (pallet) through
four bolts which can be removed using a 17 mm (5/8 in) wrench.
It is recommended to use a manual transporting device to move the
appliance to the installation site, and only at this point to remove the
base of the packaging.
The appliance should always be transported in an erect position.
If this is not possible, transport the appliance laying on its rear side.
Once at the installation site, the appliance, which is equipped with four
wheels, can be taken off the pallet and positioned in the installation
area.
4
1
Operate as follows:
Take off the four bolts
means of a 17 mm (5/8 in) open spanner.
Remove the xing brackets
To remove the front xing bracket
the rear wheel adjusting bolt
spanner.
From the back of the unit and by means of a suitable, high duty hand
trolley, take off the appliance and place it on the oor.
Be very careful to avoid any damage to oors. Delicate oors should be
protected with plywood, hard cardboard or similar material panels.
www.fhiaba.com · info@fhiaba.com · Tel +39 (0)434 420160 · Fax +39 (0)434 420161
Installation Guide
Preparing the installation
securing the appliance to the pallet by
1
and
.
3
4
, unscrew for one or two turns
3
by means of a 13 mm (1/16 in) box
2
Series: All
9