Installation Instructions; Wall Mount Installation - Honeywell IAQPoint Manuel D'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com

Installation Instructions

Wall Mount Installation

The recommended installation height is 1.5 m (5 ft) from the floor for
monitoring in offices or similar applications related to monitoring
CO
2
indoor air quality.
For applications where health hazards are an issue, such as
storage facilities, the recommended installation height is 30.5 cm (1 ft)
from the floor.
1. Mount the bracket to the electrical box
(using standard electrical screws), as shown
at right.
2. Connect wiring to terminal at back of unit.
3. Insert the tabs at the back of the IAQPoint
into the slots in the top of the mounting
bracket, as shown below.
4. Press the bottom of the IAQPoint into the
bottom of the mounting bracket, until it clicks
into place.
IAQ Point
Mounting bracket
5. If necessary, install locking screws in the holes provided at the base
of unit.
Note: The installation heights recommended by Honeywell Analytics
represent general guidelines. Always confirm with local laws and
regulations before proceeding, as these take precedence over
manufacturer's recommendations.
511838
11/07
IAQPoint User Manual
Honeywell
Introduction
Installation Instructions
CO
2
Electrical box
Mounting plate
13

Publicité

Chapitres

Table des Matières
loading

Table des Matières