Oven Installation - Furrion FSRE17SA-BL Consignes D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Cabinet and counter cutout chart:
A
D
E
Model
A
B
17" RV
173/4"
201/8"
Range
451mm
511mm
21" RV
173/4"
201/8"
Range
451mm
511mm

Oven Installation

When the cabinet has been prepared
according to the dimensions given and
the gas line is in place.
1. Remove the range oven from its
packaging.
2. Hold the baffle of the top glass cover
and pull it upwards to release it from
the oven. (Fig. 1) Push a little and lift
up to remove the top glass cover from
the oven. (Fig. 2)
F
C
C
D
E
161/8"
15/16"
19/16"
2" min
410mm
23mm
40mm
51mm
max.
max.
min.
201/16"
15/16"
19/16"
2" min
510mm
23mm
40mm
51mm
max.
max.
min.
Fig. 1
F
Fig. 2
3. Slide the range oven into the cabinet
opening. Verify the oven is level from
side to side and front to rear. (Fig. 3)
Fig. 3
14

Publicité

Chapitres

Table des Matières
loading

Table des Matières