Lenze Drive PLC EPL-10200 Serie Instructions De Montage page 43

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7
Commissioning
Tip!
In the event of faults or errors during commissioning, see chapter "Troubleshooting and fault
elimination".
Switch-on sequence
1. Before connecting the controller to the supply voltage, check the wiring for completeness and
short-circuit.
2. Switch on the supply voltage for the Drive PLC and the PC.
3. Load the required project into the Drive PLC, using the software "Drive PLC Developer Studio"
(DDS).
(
"Drive PLC Developer Studio - Getting started", Chapter 4.4
4. If you do not want to use the DDS for program control, then you can remove the connection
between the Drive PLC and the PC. Switch off the supply to both instruments before you do this.
Controlling the program
You have various options for controlling the program in the Drive PLC:
Control through
Software Drive PLC Developer
Studio (DDS)
l
Software "Global Drive
Control" (GDC)
Control (GDC)
l
Keypad E822BC
(8200 vector)
(8200 vector)
l
Keypad 9371BB (9300)
Keypad 9371BB (9300)
*)
Lenze setting
14
All manuals and user guides at all-guides.com
(
16)
Program function
Start, Stop, Reset
Automatic start
Start, Stop, Reset
Start, Stop, Reset
MA DrivePLC DE/EN/FR 1.0
)
Setting/Parameterization
Manual DDS - "Getting started", Chapter 4.4.4
and Chapter 4.4.6
*)
C2104 = -0-
Program does not start
automatically after switch-on
C2104 = -1-
Program starts automatically
after switch-on
*)
C2108 = -0-
Function executed
C2108 = -1-
Start program
C2108 = -2-
Stop program
C2108 = -3-
Reset program

Publicité

Table des Matières
loading

Table des Matières