All manuals and user guides at all-guides.com
Mount top grip bar:
3. Screw the top grip bar (1) with
the enclosed screws, butterfly
nuts and washers (6) right and
left on the central bar (7). The
butterfly nuts point inwards.
Clip in cable holder:
4. Clip the enclosed cable holder
(8) on the central bar (7) and
use it to secure the machine ca-
ble (20).
Mount ejector chute and shift
linkage
Mount ejector chute:
1. Place the ejector chute (16) on
the machine housing (11) and
screw this with the 4 enclosed
cross-head screws (30).
Mount shift linkage
2. Push the top shift rod (5)
through the opening in the plas-
tic shroud (21) on the central
bar (7).
3. Release the fastening screw
(31) on the lower shift rod (9).
4. Push the top (5) and bottom
(9) shift rod together and screw
them with the fastening screw
(31).
5. Push the handle of the top shift
rod (5) in both directions. The
ejector chute (
able to move freely.
Adjust the ejector chute
The following settings are possible:
-
-
Inserting/removing the re-
chargeable battery
16) must be
Operation
Switching ON and OFF
Turning the ejector chute to the right
or left through a total of 190°;
Tilting the ejector chute up or down
through 60°;
The steeper the ejector deflector (19),
the further the snow will be thrown.
1. Bring the ejector chute (16) into
the required direction by turning
the handle (5) of the shift linkage.
2. Release the butterfly nuts (18)
on the ejector chute and fold the
ejector deflector (19) into the
required position.
Ensure that the safety key (
is removed.
1. To insert the rechargeable
battery (27) into the battery
compartment, open the hinged
cover (24).
2. Slide the rechargeable battery
(27) into the device. It locks into
place audibly.
3. Close the hinged cover (24).
4. To remove the rechargeable bat-
tery (27) from the device, press
the unlock button (26) upward and
pull out the rechargeable battery.
Check the load status of the re-
chargeable battery before switching
on (see „Charging process").
GB
23)
69