Allmand NIGHT-LITE GR Série Manuel D'utilisation page 16

Masquer les pouces Voir aussi pour NIGHT-LITE GR Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11
3. Make the light tower trailer level using the tongue
jack. See Operating the Tongue Jack in the
Transporting section.
4. Deploy the outriggers. See Operating the
Outriggers.
5. Make the light tower trailer level front to back and side
to side using the jacks.
Operating the Outriggers
The unit has left and right outriggers at the rear of the
machine.
WARNING
Rollover Hazard
Failure to deploy the outriggers before raising the light
tower could cause the light tower trailer to tip over,
resulting in death or serious injury. Always deploy the
outriggers before raising the light tower.
Failure to lock the stabilizer jack in the operating
position could cause the back of the light tower trailer
to fall, resulting in death or serious injury. Always be
sure to lock the stabilizer jack in the operating position
with the jack locking pin.
Stabilizer jacks must be supported by a flat, level solid
ground surface.
To deploy the outriggers:
1. Pull the outrigger locking pin (A, Figure 12).
2. Move the outrigger (B, Figure 12) out until the pin
locks the outrigger in the operating position.
Note: When initially shipped from the factory, the
outrigger jacks are toward the front of the machine
(not shown) for shipping purposes. They should be
toward the rear of the machine as shown in Figure 12.
Move the outrigger completely out, turn the outrigger
so the jack is toward the rear of the machine, and
install, making sure that the pin locks the outrigger in
the operating position.
16
3. Remove the stabilizer jack locking pin (C, Figure 12),
4. Unfold the handle (E, Figure 13) of the stabilizer jack,
5. Repeat for the opposite outrigger and stabilizer jack.
To retract the outriggers:
1. Fully lift the stabilizer jack foot by turning the jack
2. Fold the handle.
3. Remove the stabilizer jack locking pin, turn the jack
A
4. Pull the outrigger locking pin, and move the outrigger
5. Do the same for the other stabilizer jack and
12
turn the jack into the operating position (D), and install
the stabilizer jack locking pin fully through the top and
bottom holes in the jack and outrigger.
then turn clockwise (F) to lower the jack foot (G) until
firmly planted on the work site surface.
handle counterclockwise.
into the transport position, and install the stabilizer
jack locking pin fully through the top and bottom holes
in the jack and outrigger.
in until the pin locks the outrigger in the transport
position.
outrigger.
D
B
C
A
www.allmand.com

Publicité

Table des Matières
loading

Table des Matières