Télécharger Imprimer la page

Blitz Lastenregler 0,5 Mode D'emploi page 56

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 91
Load handling device
Operation
Watch for the centre of gravity!
The suspended point must always be located
vertically above the centre of gravity.
Always secure pins with a cotter pin!
8.4
Adjustment of the engine inclination
By adjusting the suspension point, the load can be inclined up to ± 39°.
The adjustment takes place manually via a threaded spindle.
8.5
Lifting and lowering
Lifting and lowering is carried out solely by using the crane.
52
Only lift the load when no person is in danger.
Do not pull the load at an angle.
Do not tear off loads.
Always lift the load lightly first in order to check that the load has been held safely.
Only then the load may be lifted fully.
Only move freely suspended loads. Remove all cables, lines etc. before starting work.
Check the alignment of the load chains and turn out, if necessary.
Execute movements slowly and evenly.
Always monitor the lifting process.
122253

Publicité

loading