• Gather the tools and parts you need before you begin installation.
Control Pad
The following supplied products are necessary when attaching the Control Pad. Confirm that you have all
items before beginning.
Control Pad
Stereo mini cable
(for connecting the Control Pad (approx. 5m))
When installing the Control Pad on a wall and so on, prepare commercially available M4 screws (20 mm x4).
When installing the Pen Stand on a wall and so on, prepare commercially available M4 screws (20 mm x2).
Touch Unit (EB-1460Ui/EB-1450Ui only)
The following supplied products are necessary when attaching the Touch Unit. Confirm that you have all
items before beginning. When installing the Touch Unit outside the whiteboard, use the supplied Touch Unit
Bracket.
Touch Unit
Markers x2
Pen Stand
Port protection stickers
Touch Unit connection cable (approx. 2.8 m)
Infrared deflectors
(approx. 28.5 cm) x8
13
Installation Guide