Step 1
Set-up the pre-assembled base frame by pulling the front frame (9) away from rear frame (8) on a
flat surface. Align the pin holes and insert the ring pin (26) from inner side to secure the rear/front
frames (8/9) properly.
Step 2
Fix the handlebar left and right (6+7) on rear frame (8) by using bolts M8x60 (20), washers (19) and
nylon nuts M8 (24). Fix hexagon head bolt 8x50mm (49), incline adjustment bolt (50) and washer
(19) onto right handlebar (7) as shown in illustration.
Hardware:
9 Flat washers
(Ø16xØ8.5x1.5)
ASSEMBLY INSTRUCTIONS
4 Hexagon head bolts
(M8 x 60 mm)
Hardware:
1 Ring Pin (Ø8 x 55 mm)
Tools:
1 Wrench (#17 & #13)
1 Wrench (#14 & #17)
1 Hexagon head bolts
(M8 x 50 mm)
4 Nylon nuts
(M8)
25