Leggett & Platt Premier premium MODELS Mode D'emploi page 13

Base réglable conception de meuble, conception de fondation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 9
Install mattress retainer at the foot end of the adjustable base as follows:
a. Locate grommeted holes at foot of base.
b. Place mattress retainer ends into grommeted holes in top surface of
adjustable base (FIGURE 11). Press down until horizontal retainer
section is fl ush against base.
FIGURE 11
NOTE: If base is to be set up without a headboard, basic installation is
now complete. If headboard is to be installed, proceed to Headboard
Bracket Installation.
INSTALLATION
MATTRESS
RETAINER
Premier Series
Owners Manual 99301588-b
13

Publicité

Table des Matières
loading

Table des Matières