Leggett & Platt Premier premium MODELS Mode D'emploi page 10

Base réglable conception de meuble, conception de fondation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 3
Install (2) 9 volt batteries (not included) in power down battery compartment.
a. Locate the power down battery compartment, attached to the
control box (FIGURE 6).
b. Squeeze in on the side tabs and lift to remove battery
compartment (FIGURE 6).
c. Install batteries, making sure to orient them properly (FIGURE 7).
d. Press tabs of battery compartment into slots on control box to
reattach.
FIGURE 6
UNDERSIDE OF BASE
FIGURE 7
POWER DOWN
BATTERY
COMPARTMENT
10
Premier Series
Owners Manual 99301588-b
INSTALLATION
POWER DOWN
BATTERY
COMPARTMENT
(2) 9 VOLT
BATTERIES
INSTALLED
CONTROL BOX
SQUEEZE SIDE
TABS IN TO
REMOVE

Publicité

Table des Matières
loading

Table des Matières