Dyna-Glo DGU951SSE Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
5.
Place the water bowl (I) and wood chip box (J)
onto the water bowl & wood chip box support (K),
and slide the support (K) onto the bottom rails
inside the cabinet assembly (A).
6.
Slide the 4 cooking grates (H) onto the support
rails inside of the cabinet (A) as shown.
Installing the Rib Rack (Optional)
Place the rib and sausage rack (G) directly onto
the desired grate (H) before sliding the grate onto
the supports.
5
6
A
H
G
12
A
J
I
K

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dgu951sse-d

Table des Matières