Toto CT708U Manuel D'installation Et D'utilisation page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Extend the threaded rod
2-1/4" (57 mm) from the
finished wall.
4. Install the nuts, washers,
and rubber washers on the
threaded rods. Adjust the nuts
so that the faces of the rubber
washers are 1/16" (1.6 mm)
in front of the finished wall
(see ill. 2). The carrier should
support the toilet and not the
wall.
WARNING: Top and bottom
mounting surfaces must be
in the same plane (See ill. 3).
Otherwise, when torque is
applied to the nut, the china
may break.
5. Adjust the carrier's coupling
to make sure that there is
adequate compression in the
gasket to make a good seal.
INSTALLATION PROCEDURE
ill. 2
Adjustable
ill. 3
Finished
wall
2-1/4" (57 mm)
approx. from
Mounting
the washer
nuts and
washers
Threaded rod
coupling
Proper Installation
Finished wall
Installation surface of bowl
has 1/16" wall gap
across entire surface.
Improper Installation
Finished wall
Ø Uneven Wall Gap
Top and Bottom mounting
surfaces must be in
the same vertical plane.
Baseboard
5
/
1
16
(1.6mm)
Rubber
Washer
washer
Threaded rod
Bowl
surface
Finished wall

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ct708ugCt708uvCt708uvg

Table des Matières