Technical Data; Unpacking; Assembly / Before Commissioning; Start Up - Scheppach DC500 Traduction Du Mode D'emploi Original

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22

6. Technical data

Suction port, connection Ø
Hose length
Air power
Pressure difference
Filter surface
Container volume
Weight
Electric motor
Rated input
Motor speed
Technical changes reserved!
Noise and vibration
m Warning: Noise can have serious effects on your
health. If the machine noise exceeds 85 dB (A),
please wear suitable hearing protection.

7. Unpacking

m ATTENTION!
The device and the packaging material are not
children's toys! Do not let children play with
plastic bags, films or small parts! There is a
danger of choking or suffocating!
• Open the packaging and carefully remove the
device.
• Remove the packaging material, as well as the
packaging and transport safety devices (if present).
• Check whether the scope of delivery is complete.
• Check the device and accessory parts for transport
damage. In the event of complaints the carrier must
be informed immediately. Later claims will not be
recognised.
• If possible, keep the packaging until the expiry of
the warranty period.
• Familiarise yourself with the product by means of
the operating instructions before using for the first
time.
• With accessories as well as wearing parts
and replacement parts use only original parts.
Replacement parts can be obtained from your
dealer.
• When ordering please provide our article number
as well as type and year of manufacture for your
equipment.
100 mm
2000 mm
1150 m³/h
900 Pa
approx. 1 m²
approx. 75 l
14 kg
230 V~ / 50Hz
550 W
2900 min
-1
www.scheppach.com

8. Assembly / Before commissioning

m ATTENTION!
Always make sure the device is fully assembled
before commissioning!
8.1 Machine stand assembly (fig. 3 - 6)
• Secure the two wheels using a washer (15) and a
split pin (16) each (fig. 3).
• Secure the right-hand side panel (5a) and the left-
hand side panel (5b) using two fillister head screws
(18) and two hexagon nuts (19) (fig. 4).
• Now fit the intermediate part (13) using a total of
four fillister head screws (17) (fig. 5).
• Place the housing cpl. with engine (3) on the
machine stand and fix it with a total of eight fillister
head screws (17) (fig. 6).
8.2 Fitting the dust bag (fig. 7)
• Attach the dust bag (10) to the lower air outlet using
the clamp fitting (11) (fig. 7).
8.3 Fitting the filter bag (fig. 8)
• Insert the retaining rod (13) into the housing cpl.
with engine (3) and hook in the filter bag (11) (fig. 7).
8.4 Fitting the suction hose (fig. 9 + 10)
• Attach the suction hose (6) to the nozzle on the
housing cpl. with engine (3) and fix it with a hose
clamp (14) (fig. 9).
• Attach the hose coupling (8) to the other end of the
hose (6) using a hose clamp (14) (fig. 10).

9. Start up

m ATTENTION!
Always make sure the device is fully assembled
before commissioning!
9.1 Switching on/off, fig. 1
• To switch on, set the ON/OFF switch (4) to position
"I".
• To switch the device off again, set the ON/OFF
switch (4) to position "0".

10. Electrical connection

The electrical motor installed is connected and
ready for operation. The connection complies
with the applicable VDE and DIN provisions.
The customer's mains connection as well as
the extension cable used must also comply with
these regulations.
Damaged electrical connection cable
The insulation on electrical connection cables is
often damaged.
GB | 19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5906307901

Table des Matières