Table des Matières

Publicité

PARALLEL FUNCTION

12. PARALLEL FUNCTION INSTRUCTIONS
OFF /
ARRÊT
OVERLOAD /
ON /
SURCHARGE
OUTPUT /SORTIE
MARCHE
ESC THROTTLE ON
PARALLEL OPERATION OUTLETS
CHOKE /
STARTER
DC 12V 8.3A
OFF / ARRÊT
AC 120V
ON
OFF
MARCHE
ARRÊT
S
NEUTRAL FLOATING
NEUTRE FLOTTANT
YSTEM BONDED TO FRAME
NEUTRE MIS LA MASSE LA CARCASSE DU MOTEUR
Instructions: First, connect the 2 inverters with 2 parallel cables as per the drawing above,
and then start the inverters one at a time. At this time, the total rated power will be 3000W.
Note: Ensure the cables are connected to the inverters correctly. If they are connected
incorrectly, the inverters will not output any power and will need to be switched off and then
on again after they are correctly connected.
If you need assistance with the assembly
or operation of your Generator please call
1-866-850-6662
36
OFF /
ARRÊT
OVERLOAD /
ON /
SURCHARGE
OUTPUT /SORTIE
MARCHE
ESC THROTTLE ON
PARALLEL OPERATION OUTLETS
CHOKE /
STARTER
DC 12V 8.3A
OFF / ARRÊT
AC 120V
ON
OFF
MARCHE
ARRÊT
S
NEUTRAL FLOATING
NEUTRE FLOTTANT
YSTEM BONDED TO FRAME
NEUTRE MIS LA MASSE LA CARCASSE DU MOTEUR

Publicité

Table des Matières
loading

Table des Matières