Télécharger Imprimer la page

GOK CGV Instructions De Montage Et D'utilisation page 10

Publicité

Les langues disponibles

Les langues disponibles

10. ASSEMBLY
Before assembly, check that the product is complete and has not suffered any damage during
transport. The specialised company and the operator must observe, comply with and
understand all of the following instructions in this assembly and operating manual.
For the system to function as intended, it must be installed professionally in compliance with
the technical rules applicable to the planning, construction and operation of the entire system.
Metal chips may cause eye injuries.
Wear safety goggles!
Malfunctions caused by residues! Proper functioning is not guaranteed.
Visually check that there are no metal chips or other residues in the connections!
It is important that metal chips or other residues are blown out!
• Always install clean and undamaged gaskets.
• LH – left-hand thread version.
Screw connections
If connections leak, there is a danger of explosion, fire or suffocation!
Gas may escape if the product is turned.
Do not turn the product after it has been installed and the connections have been
tightened.
Tighten connections only when they are not pressurised.
Remove the seal
Connect the hose to the pressure
4
Risk of injuries due to blown-out metal chips!
from the propane cylinder
lh
regulator
Attach the gas cylinder valve type CGV to
the propane cylinder
lh
Attach the pressure regulator to the gas
cylinder valve type CGV
rh

Publicité

loading