Install Leg Extension; Installation Check List - Nuvo B2AV1000-1 Manuel

Table des Matières

Publicité

4.5 Install Leg Extension

1. Loosen thumbscrews under tabletop frame
before attaching or removing leg extension.
2. Insert connection rods of the leg extension
into leg section.
3. Tighten the two thumbscrews to secure the
leg extension.

4.6 Installation Check List

Check off boxes below as they are performed.
□ Install, secure power cord with wire collect tie and route power cord to prevent tripping.
□ Install Hand Pendant.
□ Lock and secure table in place.
□ Install Head Section and Leg Extension.
□ Install table pads.
□ Check all table movements (4.6.1 Performance Check List).
Figure 4-4:
4-5
B2AV1000 Series Surgical Table
IM-B2AV1000-E01

Publicité

Table des Matières
loading

Table des Matières