88
AVENTICS | PROFINET-IO | R412015162–BDL–001–AE
Commissioning and Operation
Table 16:
Assignment of the S4, S5, S6, and S7 switches
Switches Byte
S4
0
S5
1
S6
2
S7
3
A
Fig. 6:
On a bus coupler with 7/8" plug, the valve power supply is via
a push-in fitting (see B in Fig. 7). The valve supply assignment
cannot be set here on the bus coupler.
A
Fig. 7:
This switch allows valves to be assigned in groups to supply
voltages U
to the U
Double subbases for double solenoid
valves (solenoids 12, 14)
1 – 4
5 – 8
9 – 12
13 – 16
B
(A) S3.1–S3.8 monitoring threshold for valve voltages
(see Table 19 on page 92); (B) switch S4, S5, S6, S7 for
assignment of valve supply voltages (U
with M12 plug (see Table 16 on page 88)
B
(A) S3.1–S3.8 monitoring threshold for valve voltages (see
Table 19 on page 92); (B) 7/8" push-in fitting for valve power
supply
and U
. When delivered, all valves are assigned
Q1
Q2
voltage.
Q1
On Off
U
U
Q1
Q2
S3.8
S3.7
2
1
Off
On
S3
Q1
On
Off
U
U
Q1
Q2
S3.8
S3.7
2
1
Off
On
S3
Double subbases for single solenoid
valves (solenoid 14)
1 – 8
9 – 16
17 – 24
25 – 32
, U
) on bus coupler
Q2