FOTILE JQG7505 Notice D'utilisation Et D'installation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Caution: Two installers are required to ensure
safe installation.
8 . U s e t h r e e s e t s o f s c r e w s ( # 1 0 × 2
13/16"(M5×70mm)) for upper cabinet boards
to fix the main body, and secure at least two
screws before releasing.
the bottom
board of the
top cabinet
Range hood shel
If there is a big gap between the bottom board
of the top cabinet and the top of the range hood,
please add wood pads based on the gap size near
the three #10×2 13/16"(M5×70mm) screws to
avoid range hood shell deformation caused by the
tightening of screws, which will affect the use of
the range hood.
the bottom
board of the
top cabinet
Wooden plate
Range hood shel
9. Place the seal (notch downward) at the air
outlet of the machine and fix the outlet housing
with 4 outlet-housing bolts of #8×3/4"(M4×18mm).
Then, secure the duct to the duct cover and seal
the connection with aluminum tape.
10. Make sure the hood is leveled. Install the
Grease Cup, and plug in the appliance for a test
run.
Warning: Please wear the qualified protective
gloves in operation.
Caution: Please run the machine and test if
the smoke pipe leaks air after it is sealed with
aluminum foil tape. The smoke pipe should be
able to be straightened as much as possible.
Installation Instructions for the Decorative
Plate with Upper Cabinet :
Caution: Please confirm the height of the top
cabinet. If the upper cabinet is over 32 1/2" es
(825mm) high, 6"(152.4mm) or 4"(101.6mm)
decorative plate is preferred.
Diameter of smoke
Diameter of hole digging
tube 6" (152.5mm)
6 1/2" (165mm)
- 36 -
6"(152.4mm)
or
4"(101.6mm)
7 11/16"(194.4mm)
or
5 11/16"(143.6mm)
1.Unpack the appliance and check the List of
Accessories.
2. Locate the wooden beam and mark the
location with a pencil.
Framing Stud
3. Locate the duct bracket. Determine the
central point and mark the centerline on the
wall where the hood will be installed. Also, mark
the point where the central line and the top
cabinet meet. This is the location, in which to
secure the bracket. Mark screw hole locations
between the decorative sheet and the board
of the top cabinet) of the bottom board of the
top cabinet shall be deemed as the location
datum. And the distance between the upper
edge and the center of the bracket shall be 7
11/16"(194.4mm)for 6"(152.4mm) decorative
sheet and 5 11/16"(143.6mm) for 4"(101.6mm)
decorative sheet.
The upper edge (the fixed
surface between the decorative
sheet and the board of the top
cabinet) of the bottom board of
the top cabinet shall be deemed
as the location datum.
7 11/16"
(194.4mm)
or
5 11/16"
(143.6mm)
Caution: One of the wood screws(#10×2
9/16"(ST5×65mm)) for main engine must be
fastened to the beam.Screws must be fixed
at Hole A and B in the drawing; also wood
at bracket bores with corresponding wooden
stakes in Area C.
4.Fixing hooks:
1) Punch marks are on tiles (marble): Punch
the marks, and embed expansion tube for
hook screws(#8×1 7/16"(ST4.2×36mm)), and
keep the hook level with a level ruler.
2) Punch marks are on plasterboards: Screw
7/16"(ST4.2×36mm)), and keep the hook
horizontal with a level ruler.
- 37 -

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Jqg7505-w

Table des Matières