Maintenance; Installing Or Removing The Lid/Strainer Basket - BADU Alpha Fiche Technique

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 88
Pos: 134 /Technische Dokumentation/Betriebsanleitung/Wartung/Instandhaltung/allgemeine Anleitung/Wartung/Instandhaltung @ 1\mod_1428480782431_370.docx @ 27443 @ 1 @ 1
8

Maintenance

NOTICE
Before maintenance work, close all shut-off valves and drain
all pipes.
All pumps
When?
Regularly
If there is a chance of
frost
Additionally for pumps with plastic lanterns (AK version)
When?
Regularly
Prior to longer idle
periods
After completing all maintenance work, perform all necessary
measures for start-up. See point 6.1 on page 21.
Service addresses can be found on our website
www.speck-pumps.com.
Pos: 135 /Technische Dokumentation/Betriebsanleitung/Wartung/Instandhaltung/allgemeine Anleitung/Deckel/Saugsieb demontieren beziehungsweise montieren @ 1\mod_1428483024842_370.docx @ 27458 @ 2 @ 1
8.1

Installing or removing the lid/strainer basket

Any lids and strainer baskets must be removed for work to be
performed. See 8.1 in the associated pump data sheet.
Pos: 136 /Technische Dokumentation/Allgemeine Module/#### Seitenumbruch #### @ 0\mod_1426069111812_0.docx @ 891 @ @ 1
04|2017
What?
Clean strainer basket.
Drain pump and pipes sensitive
to frost in good time.
What?
Remove salt crystals caused by
the salt water. See point 8.3 on
page 27.
Rinse the pump with tap water
to prevent crystals from forming
on the mechanical seal.
Maintenance
EN 25

Publicité

Table des Matières
loading

Table des Matières