Télécharger Imprimer la page

Allmand Night-Lite V Serie Instructions D'installation page 8

Trousse de conversion de l'éclairage del coussin à halogénures métalliques pour
Masquer les pouces Voir aussi pour Night-Lite V Serie:

Publicité

Les langues disponibles

Les langues disponibles

Kit Installation: Assembly
1. Tower LED lamp assembly. Steps for connecting LED
lamps and wiring are as follows:
a. Using the hardware (A, Figure 1a) removed in
Disassembly Step 4-d attach and secure LED lamp
fixtures (B, Figure 1a) on to the light bar. Pay close
attention to the postion of the CSA stop bracket
when attaching the lamps to the light bar.
b. Take cords leading from the LED lamp fixtures and
run them through their designated cord grips (C,
Figure 1b) on the light bar. Install the cords into the
cord grip until the outer insulation is flush with the
top of the cord grip inside the light bar. Hand tighten
cord grips on cords plus 1/4 turn, and do not over
tighten.
c. Using the four 2-port lever locks that were removed
in Disassembly Step 4-c and four of the 2-port lever
locks (Ref. 9) from kit contents connect the LED
lamp cord wires to the tower cord wires in the light
bar. LED lamp #1 connections (D, Figure 1b) are
blue to white and brown to black. LED lamp #2
connections (E, Figure 1b) are blue to green and
brown to red. LED lamp #3 connections (F, Figure
1b) are blue to orange and brown to blue. LED lamp
#4 connections (G, Figure 1b) are blue to yellow and
brown to brown. Secure wires together with zip ties
(Ref. 10).
d. Re-install light bar cover (H, Figure 1a) on light
bar with existing hardware that was removed in
Disassembly Step 4-a. Make sure not to pinch wires
when re-installing light bar cover.
1a
A
B
8
H
A
1b
LED 2
LED 3
1c
C
LED 2
LED 3
C
E
F
LED 1
LED 4
Tower
LED 1
C
LED 4
C
D
G
www.allmand.com

Publicité

loading