Télécharger Imprimer la page

AUTO-HAK V65A Instructions De Montage page 6

Publicité

Les langues disponibles
  • FR

Les langues disponibles

FITTING INSTRUCTION
Clamp mark
in acc. with
Cables joining
ISO
PN
1
L
Left directional lights
2
+
Rear fog lights
3
31
Ground
4
R
Right directional lights
5
58R
Right side parking lights
6
54
Stoplights
7
58L
Left side parking lights
5
A
6
7
A
7
B
This towbar is designed to assembly in following cars:
NISSAN NOTE, 5 DOORS (E11), VAN, produced since 03.2006 till
09.2013, catalogue no. V65A and is prepared to tow trailers max total
weight 1200 kg and max vertical load 50 kg.
Thank you for buying our product. Their reliability has been confirmed in
many tests. Reliability of towbar depends also on correct assembly and right
operation. For this reasons we kindly ask to read carefully this instruction and
apply to hints.
The towbar should be install in points described by a car producer.
B
A
4
7
6
7
1
3
From manufacturer
1. Disassemble a rear bumper.
2. Disassemble supports of bumper on the left and right side (not used any more).
3. Put fish-plates (pos. 4 and 5) in this way so holes in fish-plates agree with
original holes prepared by a car producer. Fish-plates fix loosely in points (pos.
A) using bolts M10x25mm (pos. 7) from towbar accessories.
4. Put main bar of the towbar (pos. 1) to chassis frame. Fix using bolts
M10x45mm (pos. 6) through holes (pos. B) as shown on the figure 1.
5. Cut out fragment bumper's reinforcement according to figure 2.
Fig. 2
2
6.
Reassemble a bumper after cut out its fragment (underneath, in axis of
symmetry) – width 80mm and depth 70mm.
7.
Fix body of the automat and place tow-ball according to supplied instruction.
Note! Remember to place socket plate (pos. 3) as shown on the drawing 1.
8.
Tighten all bolts according to the torque shown in the table.
9.
Connect electric wires of 7-poles socket according to the instruction of the
car. (Recommend to make at authorized service station).
10. Complete paint layer damaged during installation.
After install the towbar you should get adequate note in registration book (at
authorised service station).The car should be equipped with:
Indicators
Tow mirrors
After 1000km of exploitation check all bolts and nuts. The ball of towbar must be
always kept clear and conserve with a grease.
The instruction of the assembly
80
2
axis of symmetry
Torque settings for nuts and bolts (8,8):
M 8 - 25 Nm
M 10 - 55 Nm
M 12 - 85 Nm
M 14 - 135 Nm
NOTE

Publicité

loading