Down Pull Starting From Teepee Position - Greenlee G10 Tugger Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Boom Setup (cont'd)

Down Pull Starting from Teepee Position

1. Set the brakes.
2. Pivot the elbow one or two detent positions
outward. Lift up on the nose to release any preload
on the detent pin securing the back boom to the
elbow.
3. While holding the detent out, rotate the elbow
on the back boom 180° by walking it around the
carriage.
Greenlee Tools, Inc.
Rotate 180°
G10 Tugger™ Portable Cable Puller
4. Lower the entire boom until the forward boom is
close to vertical.
5. Lower the forward boom until the elbow is close to
the angle desired for the pull setup.
6. Raise or lower the boom until the nose is just below
the conduit to be pulled from.
To use slip-in couplings:
a. Insert the appropriate slip-in conduit adapter
coupling into the nose.
b. Pivot the nose until the coupling is aligned with
the conduit and lock in position.
c. Lower the boom until the coupling clears the
conduit.
d. Release the brakes.
e. Roll the carriage forward until the coupling is
under the conduit and raise it.
To use screw-on couplings:
a. Screw the appropriate screw-on adapter
coupling fully onto the conduit.
b. Pivot the nose until it is aligned with the
coupling and lock in position.
c. Lower the boom until the coupling clears the
conduit.
d. Release the brakes.
e. Roll the carriage forward until the nose is under
the coupling, pull the detent ring, and raise the
nose onto the coupling.
Use caution when transporting or adjusting the
boom in an extended state, weight may shift
suddenly resulting in a tipping hazard.
Typical Down Pull Setup
16
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
WARNING

Publicité

Table des Matières
loading

Table des Matières