2.2 Framing
Shown below are rough opening dimensions for the plenum, unit
installation, and unit installation with a TV recess construction. See
the following page for clearances.
Rough opening framing dimensions should allow for wall covering
thickness and facing materials. Please refer to Section 3.0 on page
10 for specific facing and finishing options.
¼
6
"
(158mm)
Figure 2.2, #KZK-052 Plenum Rough Opening
Ceiling/Fireplace enclosure top
½
54
"
(1384mm)
88"
(2235mm)
Finishing
Edge
Figure 2.3, BHM-52 Unit Wall Enclosure Rough Opening
8 FRAMING AND CLEARANCES
½
53
"
(1359mm)
½
50
"
(1283mm)
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
Double horizontal
TV recess
header
Ceiling/Fireplace
enclosure top
¼
4
"
(108mm)
(2235mm)
⁄
65
"
(1667mm)
¾
28
"
½
50
"
(730mm)
(1283mm)
Komfort Zone Kit #KZK-052 R.1
88"