INSTALLATION
CART ASSEMBLY INSTRUCTIONS
STEP 2
Outdoor Appliance Head Preparation
1. First you will need to remove the angle brackets from the side of
the unit and replace them with cart mount brackets
(Fig. 04). Unit is shipped prepared for island installation.
2. Install the Bracket Tab on both sides using 8 of the
10-24 x 1/2" screws. Install each bracket with 4 screws on each side
of the grill head (Fig. 04, 05 and 06). For a CAD1-48, use the appro-
priately labeled bracket for your grill head and cart side.
Fig. 05
Note:
For the CAD1-48 there are two sets of brackets. If you have the BGB48-BQR, use the brackets labeled LEFT-48 BQR and
RIGHT-48 BQR. If you have the BGB48-BQAR, use the brackets labeled 48 BQAR.
STEP 3
Head Placement onto Cart (2 Persons Required)
1. Remove drip tray/pan (Fig. 07) and other removable components
lighten the load) such as grates, top burner caps and components,
griddle flue cover, radiant tray and grill burner for easier handling.
2. Two persons required to lift head (Double Side Burn-
Sink shown). Placing head on cart, place rear of head over the rear
the cart first (Fig. 08). Then allow the rear side tabs to first locate in
slots on the top of the cart sides. The other tabs will locate in the mid-
and front slots as the head is lowered into position on the cart (Fig.
3. Position tabs on side bracket to fit into slots on the cart (be aware of pinch points)(Fig. 10 -12). When complete, the
Fig. 08
6
SCREWS
Fig. 04
SCREWS
Fig. 06
Fig. 07
TABS
Fig. 09
(to
and
er/
of
the
dle
09).