7.9 Commissioning the lifting column

Only authorised personnel may commission a drive unit. The safety regulations and instructions in
this installation manual must be read and obeyed.
Before commissioning, you must check the lifting column for damage and note the instructions
for operating same (see section 7.3). If you cannot detect any damage, then the lifting column
can be used.
The lifting column in the Memory synchro version can be used both on its own and in conjunction
with a number of lifting columns of the same design.

7.9.1 Commissioning a single lifting column

Test the safe state of lifting column 1.
Plug the mains lead into mains connection 3.
Plug the hand switch into socket 2.
Plug the plug on the end of the mains lead into a
mains socket.
Test by carefully pressing the relevant key on the
hand switch the function for moving the lifting co-
lumn up and down.
Note when raising and lowering the lifting column
that this operates the limit switch and at the same
time switches the lifting movement off in the top and
bottom end positions.
7. Working life
2
3
1
in the example, telescopic RKPowerlift
5
61

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rk rose+krieger memory synchro

Table des Matières