Electrical Installation - Ecolab EMP Kompakt II DN20 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wall mounting:
1.
Cut the enclosed hose to the appropriate length.
2.
Dismantle the connecting parts on the prefabricated metering line.
3.
Mount the connecting parts on the adapted metering hose.
4.
Mount the prefabricated metering line (Fig. 10, pos. 1).
5.
Place the O-ring (Fig. 10(pos. 2) in the valve groove and tighten the union nut
6.
Repeat the procedure on the metering valve.
Connection of the suction line:
1.
Cut the hose with straight across
2.
Push the union nut (Fig. 10, pos. 14) and clamping part (Fig. 10, pos. 13) over the
hose.
3.
Insert the union nut and clamping part up to the stop collar on the tapered part
(Fig. 10, pos. 12).
4.
Place the O-ring (Fig. 10, pos. 11) in the valve groove.
5.
Tighten the union nut.
6.
Place the suction lance into the supply container.
6.4.2

Electrical installation

Overview:
Fig. 11: Electrical installation
I
Input for level pre-warning and empty signal
II
Input for the water meter pulse
III
Mains supply connection
31
Installation
417101964 Rev. 4-04.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kompakt ii dn25Emp kompakt ii dn40141277141278141279

Table des Matières