Operating instructions
6
Commissioning
Open tray dispensers/open sided basket dispensers
Tool
Size
10
Fig. 4: Assembly of the platform for baskets or trays
1.
Select the required components.
2.
Support the holders prior to assembly.
3.
Place the platform for baskets or trays on the base unit for
stacking equipment as shown in the figure.
The threaded bolts are seated in the pre-drilled holes.
4.
Tighten the bolts.
You have bolted the platform for baskets or trays to the basic
unit for stacking equipment.
NOTICE
Instructing operating staff
Before commissioning, operating staff must be instructed how to
operate the transport cart correctly.
Help protect our environment. Separate the pack-
aging materials and recycle them. Dispose of:
−
Packaging and foils in the (yellow) recycling bin.
−
Cardboard boxes and paper in the paper recy-
cling bin.
1.
Check the functions, paying particular attention to the lock.
2.
Adjust the tension springs to the items.
3.
Clean the stacking equipment thoroughly before first use.
The stacking equipment is ready for commissioning.
Quantity
1
14 / 24