Installation And Connection - D-Link DNR-2060-08P Guide D'installation

Masquer les pouces Voir aussi pour DNR-2060-08P:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation and Connection

Hard Drive Installation
1. Use a screwdriver to remove the screws from
the sides and top of the NVR, then gently lift
the cover.
2. There are two 3-bay hard drive racks inside.
Choose which rack you would like to install
your hard drive in, then slide the hard drive
into the rack bay.
3. Install a HDD in the NVR by connecting via the
included SATA cable.
4. Secure the hard drive in place by installing the
screws in the two round holes along the center
of the sides.
4  D-Link 6-Bay Network Video Recoder
Operation
Power On
Connect the power adapter. Switch the NVR on
and ensure the power LED on the front of the unit
is lit.
Getting Started
1. Make sure the NVR is connected to a network
via a router or a switch, or directly connected to
a PC. Please plug the cameras into the NVR`s
PoE ports.
2. The NVR will boot up, then start to record
automatically.when the NVR starts recording
automatically, the blue REC LED located on
the front panel will begin flashing continuously.
3. The NVR Search Tool is located on the
Software CD provided inside the box. After
finished with the installation of NVR Search
Tool on your machine, this tool can be used to
search the cameras connected with the NVR.
4. The NVR search tool can help you look for the
NVR and get related information. For more
detailed configuration instructions, please refer
to the user manual on the CD-ROM.
Figure 4. DNR-2060-08P NVR Search Utility

Publicité

Table des Matières
loading

Table des Matières