Greenlee SITE-RITE 840A Mode D'emploi page 5

Masquer les pouces Voir aussi pour SITE-RITE 840A:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Correcting Overbends
If a stub-up is accidentally overbent, place the open end of the bender
handle over the conduit and manipulate to desired angle.
Back-to-Back 90° Stubs
MARK
1. Make the first 90° stub.
2. Fit the bent conduit into its final position and mark the Finish Line
on the conduit, as shown. The Finish Line on the conduit is the
bending mark.
3. Align the bending mark with the tip of the star and bend the conduit
to 90°.
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
SITE-RITE
MARK
Hand Benders
®
FINISH LINE
5

Publicité

Table des Matières
loading

Table des Matières