Mitsubishi Electric SLZ-KF09 Manuel D'installation page 16

Masquer les pouces Voir aussi pour SLZ-KF09:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
4
A
B
Refer to the outdoor unit installation manual.
1
2
4
6
8
9
5
3
1
A
B
C Drain plug
D
the drain pump mechanism.
D
C
3
5
7
0
1
1. Turn on the power to the unit at least 12 hours before the test run.
1
button
1
button
.
A
2
button
blown out from the unit.
2
button
is blown out from the unit.
3
button
and check whether the fan speed changes.
4
button
5
button
to stop the test run.
details.
Be sure to turn it back to the former state after work.
1
Grille
2
Screw with washer
3
Gauge
4
5
6
Fastener
7
Fastener
8
9
Remote controller holder
0
1
3.5 × 16 mm tapping screws
Remark
1
4
1
1
1
2
2
1
wireless remote controller.
1
wireless remote controller.
2
wireless remote controller.
2
wireless remote controller.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kf12Kf15Kf18na

Table des Matières