Chapter 4
Page 16
Figure 6
Step 3: Connect
Connect the appliance according to the wiring diagram: Insert the appliance plug of the connecting
lead set into the socket of the cup dispenser and the mains plug of the connecting lead set into the
on-site power supply socket.
Put thermally insulating plates around the appliance.
The appliance is ready to be put into operation.
4.3
Putting into Operation
Before the appliance is put into operation it must be clean and dry.
The function of the operating elements and heating in the heated appliances must be checked before putting
them into operation.
Cup Dispenser
EBR/70-120 | EBR/100-150 | EBRH/70-120 | EBRH/100-150
Assembly instructions
Transport, Assembly, Putting into Operation and Decommissioning
Putting into Operation
91285809_A0