Transport, Assembly, Putting into Operation and Decommissioning
Assembly
NOTE
There is a connecting cable set with a wiring diagram attached to the built-in heated appliances.
The set consists of a connecting lead with a Schuko® plug and a connecting lead with a mains plug fitted on
the appliance. The connecting leads are wired up via the on/off switch with an integrated indicator light.
Figure 5
Step 1: Preparation
Prepare the worktop cut-out.
The cut-out dimension for the EBR/70-120 is 15.2" (385 mm) (diameter).
The cut-out dimension for the EBR/100-150 is 17.9" (455 mm) (diameter).
Step 1: Preparation
Prepare cut-outs in the worktop and the front cladding corresponding to the indicated dimensions.
The worktop cut-out dimensions are given in inch (mm) as shown in the corresponding drawing of the
built-in appliance.
The cut-out dimension for the switch is 1.2'' x 0.9'' (30x22 mm).
Remove the protective plastic film from the metal plates.
INFO
Step 2: Installation
NOTE
Insert the appliance into the worktop cut-out and fasten it.
91285809_A0
Appliance location
The built-in appliances may only be put into operation after being retrofitted or
built-in (e.g. in a cabinet).
Worktop cut-out
Disposal of packing material
The packing consists of recyclable materials and can be disposed of appro-
priately. Thereby, the different materials are to be separated and disposed in
an environmentally compatible manner. In any case, the local bodies respon-
sible for disposal are to be involved for this purpose.
Presetting the operating temperature
In contrast to the mobile appliances with the switch and controller arranged
next to each other, the switch of the built-in appliance can be placed any-
where on the front side.
Under these circumstances, the controller is no longer accessible for operat-
ing after the installation. Ensure that the desired temperature is set on the
thermostat before the installation.
EBR/70-120 | EBR/100-150 | EBRH/70-120 | EBRH/100-150
Chapter 4
Page 15
Cup Dispenser