Installing The Lever On The Shaft And The Rod On The Chamber Top; Attaching The Lance To The Trigger Valve (Starting And Stopping); Adjusting The Strap; Tightening - Jacto PJ-16 Manuel D'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ment.
• Lock the shaft with the cotter pin (2).
2
1
Hammer
3.3. Installing the lever on the shaft and the
rod on the chamber top
• Grease slighty the lever orifice and instal it on the rod. Fit a
flat washer before the locked ring.
• Grease slighty the orifice on the chamber top.
• Fit a flat washer on the shaft and rod.
• For easy assembly, install the lever on the shaft and the rod
on the chamber top at the same time.
• Install the other flat washers on the shaft and rod and lock
with the locked ring.
Rod
Lever
locked ring
3.4. Attaching the lance to the trigger valve
(starting and stopping)
• Push the lance into the trigger valve and secure it with the
screw cap.
Base
reinforcement
locked ring
Shaft
Washers
Lance
Trigger
valve
WARNING!
Do not overtighten the screw cap.

3.5. Adjusting the strap

• The tank is contoured for the operator comfort. The shoulder
straps can be quickly adjusted to properly position the spray-
er on the operator's back.

3.6. Tightening

• Hold the strap buckle firmly with one hand, and pull the han-
dle downward with the other hand.
Handle

3.7. Loosening

• Hold the buckle firmly with one hand, and pull the strap up-
ward with the other hand.
Trigger
valve
Screw cap
Hose
A
Buckle
5/53

Publicité

Table des Matières
loading

Table des Matières