Battery Operation Is Possible By Obtaining An Optional Battery Power Pack - KERN MPE Serie Mode D'emploi

Masquer les pouces Voir aussi pour MPE Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9.6 Battery operation is possible by obtaining an optional battery power pack.

1
Open the battery compartment cover (1) at the base of the display unit and insert the
rechargeable battery. Charge the battery for at least 12 hours before initial use.
The appearance of the symbol
is almost exhausted. The weighing scale will remain ready for operation for a few
more minutes before switching off in order to save battery (s. chap. 11.6 Auto off).
Load rechargeable battery.
Voltage has dropped below prescribed minimum.
Rechargeable battery very low.
Rechargeable battery completely reloaded
If the balance is not used for a longer time, take out the rechargeable battery and
store it separately. Leaking liquid could damage the balance.
MPE-BAPS-e-1710
in the weight display indicates that the battery
18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mpe 250k100hmMpe 250k100pmMpe 250k100hnmMpe 250k100pnm

Table des Matières