Application And Operation; Selecting The Sintering Program - Amann Girrbach therm 3 Mode D'emploi

Masquer les pouces Voir aussi pour therm 3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
A P P L I C A T I O N A N D O P E R A T I O N
6

Application and Operation

E N
Before starting-up the furnace, it should
acclimate at the set-up location for 24
hours. Swift heating up in cold condition
can cause damage to the heating elements
(for example, burning-through).
During the first heating up, there may be
odour nuisance due to binding agent
fumes escaping from the insulation mate-
rial.
▷ Provide for thorough ventilation of the
furnace set-up location when heating up
for the first time.
WARNING:
Danger of fire and explosion!
The furnace surfaces become very warm.
▷ Do not place objects on the furnace!
NOTE:
Insufficient sintering results due to faulty tem-
perature control!
▷ Prior to every process, visibly check the ther-
moelement for damage.
DANGER:
Hot air at the outlet opening!
▷ Do not reach with your hand at or above the
outlet opening.
▷ Do not place objects on the furnace!
▷ Do not hang objects directly above the fur-
nace!
30
6.1

Selecting the sintering program

▷ To select a program: Press the
The list menu is indicated.
P1 zirconia standard
P2 zirkonia fast
P3 zirkonia slow
1
P
abc
4
ghi
7
pqrs
tuv
Fig. 9
Display, list menu
▷ In the list, select the desired program with the
keys
-or-
▷ directly select the program by pressing the
key and the respective number key.
▷ To take over the program: Press the
The display switches to the operating level.
▷ To display the segments of the program: Press
the
key.
key.
2
3
def
5
6
jkl
mno
8
9
0
wxyz
+_-
key.

Publicité

Table des Matières
loading

Table des Matières