Preparing The Light Tower Trailer For Use - Allmand NIGHT-LITE V Serie Manuel D'utilisation

Masquer les pouces Voir aussi pour NIGHT-LITE V Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
Ref 
 N 
Lifting Ring 
 O 
Radiator Cap Access Door 
 P 
Fluid Containment Drain (under unit) 
 Q 
Engine Oil Drain 
 R 
Outriggers (2) 
 S 
Rear Tie-Down Points (2) 
 T 
Auxiliary AC Outlets 
 U 
Taillights (2) 
 V 
Rear (Engine Compartment) Door 
3
Ref 
 W  Manual Storage Container 
10
Description 
Description 
Ref 
 X 
Engine 
 Y 
Light / AC Outlet Circuit Breaker Control Panel 
 Z 
Battery 
 a 
Generator 
Preparing the Light Tower
Trailer for Use
If the light tower trailer has been stored or idle for a period of
time, follow these steps to prepare the Night-Lite™ V-Series
light tower trailer for use. 
WARNING
Operating or towing a machine with worn, damaged or
missing parts could result in death or serious injury. Always
replace worn, damaged or missing parts promptly. Do not
operate or tow this machine until all worn, damaged or
missing parts have been replaced, and proper operation of
the machine has been verified. 
NOTICE
The use of authorized replacement Allmand parts is
encouraged. The warranty does not cover damage or
performance problems caused by the use of parts that are
not authorized replacement parts. 
1. Check that a copy of the Operator's Manual is with the
light tower trailer in the manual storage container. 
2. Check that all safety decals are legible and in place
on the light tower trailer. See  Safety Decals  in
the  Operator Safety  section. 
3. Check the light tower trailer for proper operation: 
A. Check to be sure the trailer tongue is secured in
either the park or towing position. See  Trailer
Tongue . 
B. Use an appropriate means to safely support the
trailer tongue. Check that the tongue jack operates
properly, and that the jack can be secured in the
transport position as well as the trailer support
position. See  Operating the Tongue Jack . 
C. Check that the outriggers operate properly, and
that each one is secured in the transport position.
(When initially shipped from the factory, the outrigger
jacks are positioned toward the front of the machine.
The outrigger jacks should be repositioned toward
the rear of the machine.) See  Operating the
Outriggers  in the  Operation  section. 
D. Check the winch and cable system for proper
operation, and that the cable is not frayed or
damaged. 
E. Check that the trailer coupler operates properly,
and that the trailer coupler / lunette eye is securely
fastened to the light tower trailer tongue. See  Using
The Trailer Coupler / Lunette Eye . 
Description 
www.allmand.com

Publicité

Table des Matières
loading

Table des Matières