3.2.1 External change-over signal
pump
1
N
L
N
L TB
If an external change-over signal is used, the
DEU
overall installation switches accordingly be-
ENG
tween heating and cooling.
FRA
3.2.3 Pump/boiler 24 V
NDL
ITA
ESP
L1 L2
L
N
The boiler connection allows the control of a
heat generator. Additionally, a pump can be
supplied and controlled directly.
34
boiler
ECO
CO
H %
2
1
2
1
2
1
2
1
2
Cooling
Heating
N
L
pump
boiler
ECO
1
2
1
2
1
2
L1'
L2'
TB
Wärme-
boiler
erzeuger
3.2.2 Pump/boiler 230 V
230 V
24 V
HZ 1
HZ 2
1
2
1
2
1
2
1
2
N
L
The boiler connection allows the control of a
heat generator. Additionally, a pump can be
controlled directly.
24 V
CO
H %
1
2
1
2
1
HZ 3
HZ 4
HZ 5
pump
boiler
1
2
1
2
1
2
1
2
1
2
1
N
L
N
L TB
boiler
HZ 1
HZ 2
HZ 3
HZ 4
2
1
2
1
2
1
2
1
2
1
2
230 V
HZ 6
HZ 7
HZ 8
ECO
CO
H %
1
2
1
2
1
2
1
2
2
1
2
1
2
1
2
HZ 5
HZ 6
HZ 7
HZ 8
1
2
1
2
1
2
1
2
1
2
1
2
H
1
2