General Notes - ESAB SCT-4200 Serie Instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATING DATA, CLEANING DATA, AND PART NUMBERS

GENERAL NOTES:

1. Pressures given are measured at the torch; there-
fore, pressure drop through hose should be consid-
ered when setting pressure at the regulator. Gener-
ally, 1/4-in. hoses up to 25-ft. long are adequate for
cutting steel up to 4-in. thick. If longer hoses are
required and if cutting thicker steel, 3/8-in. hoses
should be used. If using low-pressure fuel gas,
3/8-in. fuel gas hose should be used for all cutting
operations.
NOTE: Primarily designed for use with FG-2 or MAPP. May be used with acetylene if heavy preheat is
desired.
Nozzle
Nozzle
Size
Part No.
Size
Part No.
in.
1/4"
998589
1/2"
998590
1-1/2"
998591
4"
998592
8"
998593
12"
998594
Nozzle
Sleeve
Nozzle
(Internal)
(External)
Size
P/N
P/N
1/4"
19485
19518
1/2"
19486
19518
1"
19487
19518
2"
19488
19518
Nozzle
Sleeve
4"
19489
19519
Nozzle (Internal) (External) Thickness,
6"
19490
19519
Size
P/N
P/N
8"
19491
19519
1/4"
19485
12"
19492
19519
1/2"
19486
19518
1"
19487
2"
19488
 If using LPNG injector (19417) in torch, it will operate with natural pressure less than 1/2 psig.
 Use soft-bristled brush (750F99) to clean preheat slots of internal nozzles.
4"
19489
6"
19490
19519
8"
19491
12"
19492
² If using LPNG injector (19417) in torch, it will operate with natural pressure less than 1/2 psig.
l Use soft-bristled brush (750F99) to clean preheat slots of internal nozzles.
4216 Series Fuel Gas One-Piece Cutting Nozzles
4216 Series Fuel Gas One-Piece Cutting Nozzles
NOTE: Primarily designed for use with Propylene or MAPP
Steel
Pressure, psig
Steel
Gas Pressure,
Thickness,
Thickness,
psig
in.
Oxygen
Oxygen
1/4
20-25
1/2
30-35
3/4
30-35
1
35-40
1-1/2
40-45
2
25-30
3
30-35
4
35-40
6
35-45
8
55-65
10
40-50
12
55-65
4217 Series Fuel Gas Two-Piece Cutting Nozzles
Steel
Thickness,
in.
Oxygen
1/4"
30
4217 Series Fuel Gas Two-Piece Cutting Nozzles
1/2"
35
1"
40
2"
45
Steel
Pressure, psig
4"
40
6"
50
in.
Oxygen FG-2 Propane Nat. Gas² Oxygen FG-2
8"
50
1/4"
30
12"
75
1/2"
35
1"
40
2"
45
4"
40
6"
50
8"
50
12"
75
2. The table shows average values based on typical
conditions. The type and quality of steel, its surface
condition, the purity of the oxygen, etc. will always
have a bearing on the end results.
Gas Consumption, ft
Gas Consumption
ft
/hr
3
Fuel Gas
Oxygen
Fuel Gas
Oxygen
3-5
55-60
3-5
70-80
3-5
135-155
3-5
150-165
3-5
160-210
3-5
215-245
3-5
235-290
3-5
270-320
5-10
410-480
5-10
580-670
10-15
580-805
10-15
845-975
Pressure, psig
Fuel Gas
FG-2 Propane
Nat. Gas
4
6
7
4
7
8
4
8
9
5
9
10
4
8
10
Fuel Gas
5
12
13
6
15
16
4
6
7
8
18
20
4
7
8
4
8
9
5
9
10
4
8
10
5
12
13
6
15
16
8
18
20
6
/hr
3
Cleaning Drill
Size
Fuel Gas
Preheat
Fuel Gas
Preheat
3-4
67
4-5
67
7-8
64
7-8
8-9
8-10
62
8-10
10-11
11-13
59
15-17
20-23
56
22-28
Gas Consumption, ft
hr
3/
Fuel Gas
Oxygen
FG-2
Propane
70
8
12
120
9
14
180
10
15
250
11
16
Gas Consumption, ft
/hr
3
370
12
18
Fuel Gas
520
14
20
Propane Nat Gas Cuttingl
610
16
22
70
8
12
860
20
30
120
9
14
180
10
15
250
11
16
370
12
18
520
14
20
610
16
22
860
20
30
Cleaning
Drill Size
Cutting
Cutting
68
60
53
46
39
31
Cleaning
Drill Size
Nat. Gas
Cutting•
30
68
32
60
35
53
40
50
Cleaning
45
43
Drill Size
50
39
55
35
30
68
85
31
32
60
35
53
40
50
45
43
50
39
55
35
85
31

Publicité

Table des Matières
loading

Table des Matières