Télécharger Imprimer la page

Miele MF05 10 Notice De Montage page 11

Masquer les pouces Voir aussi pour MF05 10:

Publicité

Produktgruppe 512
11 von 48
Connect the coding plugs as follows:
Connect coding plug WRG1 to module 5 (liquid dispensing 1 - 3 and water recycling (WRG)) EZL 235 - Plug connector ST6,
PIN 2-3, Fig. 3, Pos. 5a.
Connect coding plug MFM 53X to module 5 (liquid dispensing 1 - 3 and water recycling (WRG)) EZL 235 - Plug connector ST7,
PIN 1-2, PIN 3-4, Fig. 3, Pos. 5b.
Connect plug N1Q_ST11A to module 5 (liquid dispensing 1 - 3 and water recycling (WRG)) EZL 235 - Plug connector ST11,
PIN 1-2, Fig. 3, Pos. 5c.
Connect coding plug 40X to module 5 (liquid dispensing 1 - 3 and water recycling (WRG)) EZL 235 - Plug connector ST14,
PIN 1-4, Fig. 3, Pos. 5d.
Connect coding plug MFM 1-2-5 to module 5 (liquid dispensing 1 - 3 and water recycling (WRG)) EZL 235 - Plug connector ST3,
PIN 1-2-5, Fig. 3, Pos. 5e.
Register module 5 (liquid dispensing 1 - 3) as follows:
Via Service level
Main menu
button
Activate disk symbol to save the setting.
Switch on the dispensing display.
Via Service level
Main menu
Back button (to go back one level)
Note
If the dispensing display is activated, the operator can activate and deactivate dispensing. If the dispensing display is not activated,
dispensing activation and deactivation is controlled by the programme in operation only.
To quit the service mode, switch off the machine.
Dispenser pump connection and calibration:
Break out the pre-punched area in the machine rear panel.
Fit the cable throughfeed on the rear panel, Fig. 4.
Connect the dispenser pumps in accordance with the wiring diagram.
If the pump capacity (flow rate) is known, enter the figure directly in the supervisor level as follows (e.g. dispenser pump 1).
Supervisor level
Main menu
button (to go back one level)
If the pump capacity (flow rate) is unknown, calibrate the dispenser pump in the supervisor level as follows (e.g. dispenser pump 1).
Supervisor level
Main menu
Place the dispenser pump suction tube in a container with a level mark.
Fill the container to the level mark.
Press button 0/1 (dispenser pump operates for 60 s).
Use a measuring vessel to refill the container to the level mark.
Note the dispensed quantity via the measuring vessel and enter this figure in the display (V:.....ml).
Activate the disk symbol to save the setting.
Register the empty signal as follows (e.g. dispenser pump 1).
Supervisor level
Main menu
(to go back one level)
Check dispensing in the programmes and carry out adjustments if necessary.
Carry out a functional check.
Register water recycling (WRG) as follows:
Via Service level main menu
button
2x back button (to go back two levels)
Carry out a functional check.
To quit the service mode, switch off the machine.
Carry out final work:
Check the machine for leaks.
Refit the liquid dispensing cover plate on the rear of the machine.
Refit the machine lid.
Carry out appropriate safety checks.
Reconnect the machine to the electrical supply and, if appropriate, the gas supply. Switch the utilities on.
en
10.02.2012
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Service settings
Module registration
Service settings
Basic settings
Activate disk symbol to save the setting.
Settings
Dispensing capacity
Activate the disk symbol to save the setting.
Settings
Dispenser calibration
Settings
Dispenser empty signal
Activate disk symbol to save the setting.
Service settings
Basic settings
Activate disk symbol to save setting.
Umbau- und Montageanweisung
EZL with coding 5
Module registration?
Dispensing
Dispensing display: Off
Dispenser pump 1: No
.....ml/min
Dispenser pump 1.
Dispenser pump 1: No
Yes
Water intake
Valve block 2
M.-Nr. 09081940
OK
On
OK button
OK button
Back
OK button
Back button
Water valve 3: K6
OK

Publicité

loading

Ce manuel est également adapté pour:

Mf05 20