Figure 12. Locking Ring Alignment; Figure 13. Locking Ring; Figure 14. Locking Ring Level; Locking Ring Tool - Zodiac AquaPure EI 1APURE35C Guide D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Zodiac
®
Align bump with
top thread on
the lower clamp

Figure 12. locking Ring Alignment

14. Screw down the locking ring to the threaded
clamp using the locking ring tool
(see Figure 13).
nOTE Ensure the locking ring is level when engaging the
threading clamp (see Figure 14).

Figure 13. locking Ring

Figure 14. locking Ring level

AquaPure
Ei Series APURE35C
®
Locking Ring
Tool
x
|
Installation and Operation Manual
15
Securely connect the cell leads to the like
colored terminals (see Figure 15).
16. Attach the terminal cap (see Figure 16 ).
Red

Figure 15. Connecting Cell leads

Figure 16. Attaching Terminal Cap

3.4
Wiring the Power Pack to Power
source
1.
Wire power pack to pool pump power source
using 3.3 mm
conduit. Wire the power pack to the LOAD side
of a pump or the LOAD side of the pool pump
timer relay so that the chlorinator can only
come on when the pool pump comes on (see
Figure 17).
Page 13
English
Black
Red
(12 AWG) insulated wire and
2
Blue

Publicité

Chapitres

Table des Matières
loading

Table des Matières