** = 2 controls synchronized via distributions
Travel times
• At full load, the lifting modules can be moved for a maximum of 2 min.
in a row (with three lifting modules max. 1 min). Afterwards, a cooling time
of up to 18 min. is necessary (after 1 min. operation approx. 9 min.). The
control unit monitors the temperature and switches off with an error message,
if necessary, see section "Troubleshooting". After a cooling time of at least
one minute, movement is possible again with restrictions.
• The control monitors the converted energy. With partial load, correspondingly
longer movement is thus possible. At 50% of the load, the running time
is about doubled, etc. Tilting moments have a reducing effect.
6
Transport and storage
Protect the product from mechanical stress, dirt and humidity.
See also section "Ambient conditions".
7
Installation
Live components
Risk of death due to electric shock.
Protect all electronic devices from contact with liquids.
Protect connection lines from squeezing, bending and tensile load.
When installing the connection lines, secure them tightly and protect them
from mechanical loads.
In case of malfunctions, pull out the mains plug
7.1
Installation requirements
See also section "Technical data".
WARNING
3 842 559 935/2019-08, MPS: Control unit, Bosch Rexroth AG
Transport and storage
15/30