Fitting and assembling
Assembling of base
Remove all the parts from the packaging
material and keep them aside. Ensure that you
have all the parts identification list, else get in
touch with your nearest Black & Decker service
agent for assistance.
Make sure your fan is switched off before
connecting to or disconnecting from power
supply. Ensure that the voltage rating on the
base plate corresponds to the mains voltage at
your home.
1. Lead the power cord through the opening in
the base.
2. Insert the stand into the base by hinging it
from the front side and then snapping it on
the two snaps on the rear. Ensure that the
main unit is well secured in place to the
base.
3. Lead the power cord through the recess at
the sideof the base.
Stand
Base
Usage of Box Fan
Remove the complete unit from the packaging
material and keep it aside. Ensure that your fan
is intact, else get in touch with your nearest
Black & Decker service agent for assistance.
Make sure your fan is switched off before
connecting to or disconnecting from the power
supply. Ensure that the voltage rating on the
base plate corresponds to the mains voltage at
your home.
Move the speed switch vertically upwards to
desired fan speed depending upon your
requirment.
This fan has three different speed settings for
optimum air cooling of your room.
0 - Off
1 - Low
2 - Medium
3 - High
The louvre can be made operational by rotating
the lower switch to the 'O' position this giving an
all around circulation of air.
ENGLISH
5