8 - MAINTENANCE
8.1 - CHECKLIST FOR RECOMMENDED REGULAR CHECKS
Checks effected on...........................................by...................................................................of the company............................................
Panel fixing
External unit fan fixing
External unit coil cleaning
Charged pressure of water system
Docking joints, caps and shafts
Leak visual check on solar panel fittings
Air in the pipes
Flow switch / differential pressure switch function
Capacity contactor status
Terminal closing, cable insulation integrity
Voltage and phase unbalancing (no load and on-load)
Absorptions of the single electrical loads
Compressor carter resi stance test
Leak control *
Measure of operating parameters of the refrigerant circuit
Check drier filter
Presence of oil stains
Closure of pipe unions, Scrader caps
Protective device / integrity test : safety valves, pressure switches, thermostats, flow switches etc
Check schedulers, setpoints, compensations, etc...
Control device / integrity test : alarm signalling, thermometers, probes, pressure gauges etc
Fill in the unit booklet
Notes / interventions recommended to the owner
* Refer to the local actuation regulations; in short and as an indication only the regulation prescribes that which follows.
Companies and technicians that carry out installation, maintenance/repairs, leak control and recovery interventions must be CERTIFIED as prescribed by
the local regulations.
The leak control must be carried out annually.
intervention frequency (months)
1
6
12