INSTALLATION
1 phase connection
1 phase connection (1 1N a.c. 230 V / 50 Hz):
The voltage between live and neutral is 230 V a.c.
Install connecting bridges between connection points 1-2 and 4-5. Your
group must be protected by a fuse of at least 32 A. The connecting power
cable must have a minimum core cross section of 6 mm
ignition transformer/
left zones
Connecting block
You can use the bridges provided on the connecting block to make the
required interconnections as indicated in the preceding illustrations. How
to install the bridges is indicated in the junction box cover and in the
illustration below. The bridges should not be placed immediately on top
of the connecting wires, but between the screw-head and the clamp
around the connecting wire.
Secure the cable with the strain relief and close the cover.
178
electrical connection
2
.
right zones
INSTALLATION
Preparing the hob
1/2" ISO 228
(straight)
1/2" ISO 228
(straight)
sealing ring
Fit the elbow supplied on the appliance's gas connection.
A
Remove the protective foil of the sealing strip (A) and attach the sealing
strip in the groove of the aluminium profiles or the edge of the glass
plate. Do not attach the sealing strip through the corner. Instead, cut
4 pieces that fit tightly together in the corners.
building in
1/2" ISO 7/1
(conical)
sealing ring
1/2" ISO 228
(straight)
only for France
179