Commissioning, Operation; Requirements For Mounting Point - WIKA PSD-4 Mode D'emploi

Masquer les pouces Voir aussi pour PSD-4:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Commissioning, operation

5. Commissioning, operation
5.1 Check the instrument
Prior to commissioning, the pressure switch must be subjected to a visual inspection.
Leaking fluid is indicative of damage.
Only use the pressure switch if it is in perfect condition with respect to safety.
Check the diaphragm for any visible damage, since this is a safety-relevant component.

5.2 Requirements for mounting point

The mounting point must meet the following conditions:
Protected from weather influences.
With a high ambient temperature and a high UV irradiation, the pressure switch must be installed with additional
covering in order to avoid damage to the digital indicator and buttons.
Sealing faces are clean and undamaged.
Sufficient space for a safe electrical installation.
For information on tapped holes and welding sockets, see Technical information IN 00.14 at www.wika.com.
Permissible ambient and medium temperatures remain within the performance limits. Consider possible restrictions
on the ambient temperature range caused by mating connector used.
→ For performance limits see chapter 9 "Specifications"
WIKA operating instructions pressure switch, model PSD-4
EN
11

Publicité

Table des Matières
loading

Table des Matières