SIFA POP 0612 Guide Technique page 72

Vitrine pâtisserie
Table des Matières

Publicité

I
2.10.3 FASI DI CANALIZZAZIONE (I)
(comune a tutte le tipologie di vetrine POP)
1° Fase: Accostare le due vetrine nei punti di canalizza-
zione.
2° Fase: Inserire le testatine e barre filettate (Fig. 29, Pos.
1, 2, 3, 4).
3° Fase: Inserire le testatine (Fig. 29, Pos. 1.1, 2.1, 3.1, 4.1).
4° Fase: Inserire i dadi ciechi e barre filettate (Fig. 30, Pos.
5, 6, 7, 8).
5° Fase: Inserire i dadi ciechi (Fig. 30, Pos. 5.1, 6.1, 7.1,
8.1).
Fig. N°29
Abb. N°29
1
2
3
4
72
GB
2.10.3 CONNECTING PHASES (I)
(featured on all the types of POP display cabinets)
1st phase: Bring the two display cabinets in their con-
necting points.
2nd phase: Insert the heads and threaded bars (Fig.
29, Pos. 1, 2, 3, 4).
3rd phase: Insert the heads (Fig. 29, Pos. 1.1, 2.1, 3.1, 4.1).
4th phase: Insert the blind nuts and threaded bars (Fig.
30, Pos. 5, 6, 7, 8).
5th phase: Insert the blind nuts (Fig. 30, Pos. 5.1, 6.1,
7.1, 8.1).
1.1
2.1
3.1
4.1

Publicité

Table des Matières
loading

Table des Matières